Temporary Water Transfer System
Our client required an on-pond water transfer system to replace a shore based system that was being impacted due to lowering pond water levels. The client required a highly compressed schedule to have the new system operational within 4 months.
GN2 performed:
-
Design Basis Memorandum
-
HAZOP Facilitation
-
Hydraulic analysis of water transfer system and downstream tailings systems
-
Control narratives
-
Barge stability and mooring analysis
-
Detailed engineering of two barges and associated on shore distribution piping to plants
Fit for purpose design in schedule driven project