Expediting Levels from Level 1 to Level 4 are assigned to each Purchase Order. Levels are established by the complexity of each package, critical rating, lead time, and schedule requirements.
Monitor Data and Documentation from Suppliers including review and return from Engineering to Suppliers.
Expediting services to monitor and track material deliveries to maintain schedule.
Timely facilitation of supplier and fabricator Requests for Information (RFI) to keep production on schedule.
Shop expediting to monitor and track progress.
Slip alert notifications and mitigations.
Issue Shipping Release Notifications in coordination with site receivers.
Material & Equipment Control:
Coordinate with shop and field receivers to schedule deliveries.
Converse with receiving crews for material acceptance and timely issuance of material Receiving Reports (MRR’s).
Administration and resolution of any material or equipment over, shortage and damages (OS&D) claims.
Ensure availability of proper material handling equipment for offloading deliveries.
Optimize material storage and turnover of goods for fabrication.
Superior project support via dedicated on-site & off-site personnel.
Segregate Spare Parts and Special Tools required for installation, startup and commissioning from Capital Spares.
Case Study
Custom Design-Build Maintenance Wedge Dock
Our Oil Sands Client
required a maintenance
access point for servicing
on-pond tailings assets.
The project constructed a
modular dock to provide
mooring space and a
dedicated crane pad.
The dock was constructed of
twelve structural modules
for offsite fabrication and
straight-forward assembly
on site.
Concept Selection, Detailed
Design, and ultimately the
supply of the dock were all
performed by GN2.