top of page
Gland Water Piping and Hot Tap Design
An existing booster station required a new gland water feed in a short time frame due to issues with the current supply piping.
Within 3 weeks, GN2 designed a gland seal water supply system with a hot tap tie.
Emergency work package for critical line
bottom of page